Gurumada Bridge, Panagamuwa

Category
Bridges
Client
Provincial Road Development Authority (PRDA)
Location
Panagamuwa
  • Riverbed excavation for a bridge abutment, with the river diverted around the work area
  • Abutment base formwork and starter bars set on rock in a riverbed excavation
  • Steel fixers in hard hats tying the reinforcement for a bridge abutment base
  • Base concrete placed inside the reinforcement cage of a bridge abutment

Project details

Scope

Reconstruction of the Gurumada Bridge at Panagamuwa under the PRDA's post Cyclone Ditwah restoration works: riverbed excavation, abutment formwork, reinforcement and concrete.

Challenge

Rebuilding a bridge after cyclone damage means working in an active riverbed, with water levels to manage and a community waiting for its crossing to reopen.

Solution

The river was diverted around the work area and the foundation pit kept dry with pumps while the abutment base was formed on rock, reinforced and poured.

Outcome

Abutment foundations completed on rock for the new bridge structure.

More projects

All projects
Tower FoundationsCrew in hard hats preparing a rock foundation pit for a tower, with the blast cordon tape strung across the site behind them

Ukuwela to Kiribathkumbura High Tension Line

Kalpataru Projects International Limited · Ukuwela to Kiribathkumbura, Central Province

Excavation, drilling and blasting for high tension transmission tower foundations along the Ukuwela to Kiribathkumbura line.

RoadsExcavators working a rocky hillside cutRepresentative photo

A5 Road, Gampola to Nuwara Eliya

China Harbour Engineering Company (main contractor) · Gampola to Nuwara Eliya, Central Province

Drilling, blasting and embankment excavation on the A5 road improvement between Gampola and Nuwara Eliya, as rock subcontractor to China Harbour.

RoadsExcavator loading broken rock into a dump truck below a rock faceRepresentative photo

A10 Road, Kurunegala to Katugastota

China Jiulong (main contractor) · Kurunegala to Katugastota

Drilling, blasting and earthwork on the A10 Kurunegala to Katugastota road, as rock and earthwork subcontractor to China Jiulong.

Rock between you and your programme? Talk to our engineers.

Send your drawings and an estimate of the rock volume or number of tower footings. Our engineers will reply with a method and a price.